Type: Bridge

Date: July 2002
Location:
Main Street Bridge at Cottonwood Creek between the cities of Red Bluff and Redding, California
General Contractor: Shasta Constructors

Length of Bridge: 1,180 ft.

Erection Time/Schedule: Five days

Products:
36 precast girders
Length – 136 ft.
Width – 4 ft.
Depth – 6 ft. 1 in.
Weight of each – 145,000 lbs.
Click below to view products:

136 foot long girders in the process of being erected.
Note: specialized hauling equipment.

Connecting the post-tensioning between
aligned girders.

Four girders per span.

Girder erection, a crane at each end.
Additional information
Structure was continuously post-tensioned from deck dead load and the applied live load.

Questions?
Contact Con-Fab's engineering team for more information on this case studies and to discuss how we can save you time and money on your next project.

Tel: (209) 249-4700
 
Home | About Con-Fab | Products | Case Studies | Why Precast? | Contact Us | Careers | Press | Site Map
Contractors | Public Entities | Consultants, Architects and Engineers | Developers | Vendors
© 2000 Con-Fab California Corporation. All rights reserved.