Type: Bridges

Date: 2007
Location: Oakland, California
General Contractor: CC Meyers

Size: Approx. 55' x 5' x 4'4"; 244,000 Lbs.

Erection Time/Schedule: 1 Night

Products:
Precast Bent, Bridge Member
Additional information
Con-Fab worked with CC Meyers and Caltrans to repair the collapsed I-580 Inner Connector ramp. Con-Fab supplied and installed the precast Bent cap nine days after being given notice to proceed. The bent was installed three days ahead of schedule.

Questions?
Contact Con-Fab's engineering team for more information on this case studies and to discuss how we can save you time and money on your next project.

Tel: (209) 249-4700
 
Home | About Con-Fab | Products | Case Studies | Why Precast? | Contact Us | Careers | Press | Site Map
Contractors | Public Entities | Consultants, Architects and Engineers | Developers | Vendors
© 2000 Con-Fab California Corporation. All rights reserved.