Date: 2007 Location: Oakland, California General Contractor: CC Meyers
Size: Approx. 55' x 5' x 4'4"; 244,000 Lbs.
Erection Time/Schedule: 1 Night
Products:
Precast Bent, Bridge Member
Additional information
Con-Fab worked with CC Meyers and Caltrans to repair the collapsed I-580 Inner Connector ramp. Con-Fab supplied and installed the precast Bent cap nine days after being given notice to proceed. The bent was installed three days ahead of schedule.