| You
are here: Home > Case
Studies > Stockton
16-Screen Theater |
|
Type: Wall
Panels
Date: June 2003
Location: Stockton, California
General Contractor: F&H Constructors
Size: Approx. area 130,000 sq.
ft.
Erection Time/Schedule: 20 working
days
|
Products:
348 precast prestressed panels, 8 inches thick and 40 feet high, varying
in width from 8 to 13 feet |
Click below to view products:
|
|

Panoramic view of the erected precast panels. |

Panels braced for horizontal loading
during erection. |

Lifting wall panel off truck. |
|
 |
Additional information
Con-Fab manufactured panels at the rate of 3,600 sq. ft. per
day.
The theater was part of a major redevelopment of downtown Stockton.
The erection of the structure was under intense scrutiny at first,
but ended up sailing through with flying colors.
|
 |
Questions?
Contact Con-Fab's engineering team for more information on this case
studies and to discuss how we can save you time and money on your
next project.
Tel: (209) 249-4700
|